Mid-Autumn Festival 2026: Factory Holiday Notice & Production Schedule
Official Notice: In observance of the traditional Chinese Mid-Autumn Festival, tprefractory offices, production facilities, and warehouse dispatch centers will observe a scheduled holiday break from September 25 to September 27, 2026. Normal manufacturing operations, laboratory testing, and container dispatch will fully resume on Monday, September 28, 2026.
To ensure uninterrupted furnace maintenance and prevent project delays for our overseas partners across North America, the Middle East, and Southeast Asia, please review our operational guidelines, dispatch cutoffs, and emergency contact procedures below.

Production Lead Times & Order Cutoff Guidelines
The Mid-Autumn Festival holiday causes short-term port congestion, reduced inland freight capacity, and ocean carrier cutoffs across major shipping hubs in North China, particularly Qingdao Port (FOB Qingdao).
To ensure your refractories arrive on schedule for planned kiln turnarounds or furnace relining, we recommend adhering to the following lead-time checkpoints:
| Product Category | Stock / Production Status | Order Lead Time Guidance |
|---|---|---|
| Ceramic Fiber Blanket (CFB) | Standard 1260°C & 1430°C grades (13mm, 25mm, 50mm) in stock at Qingdao warehouse | Orders confirmed before Sept 21 dispatch prior to holiday; later orders load starting Sept 29 |
| Ceramic Fiber Board & Modules | CNC-cut board & pre-compressed folded modules with SS310/Inconel anchors | 10–14 days production lead time; queued for post-holiday dispatch |
| High Alumina & Fire Clay Bricks | Standard straight shapes (SK-34, SK-36, 70% & 80% Al2O3Al2O3) in inventory | Standard pallets available for rapid export consolidation |
| Mullite Insulating Bricks (JM Series) | JM23, JM26, JM28 precision-machined lightweight refractory bricks | Specialized palletizing & export packing resumes Sept 28 |
| Refractory Castables & Mortars | Low cement castables, dense gunning mixes & high-alumina castables | Batch mixing & moisture-proof packaging queue resumes Sept 28 |
| Silicon Carbide & Acid Proof Bricks | Specialized abrasion-resistant & chemical plant lining materials | Order confirmation active; technical drawings verified during holiday |
| Calcium Silicate Board (CSB) | 650°C and 1000°C backup insulation panels (50mm, 100mm) | Pallet dispatch ready for post-holiday vessel booking |
Shipping, Customs & Inland Transport Schedule
Port Operations (Qingdao Port): Qingdao terminal gates remain functional for scheduled container departures, but inland trucking and export customs clearance will operate under limited holiday staffing from September 25 through September 27.
Pre-Holiday Vessel Loadings: Orders scheduled for vessels departing during the holiday week have already been gated into terminal yards and export-cleared. Verified shipping documents (Bill of Lading, COA, Mill Test Certificates, and Fumigation Certificates) will be transmitted digitally as scheduled.
Post-Holiday Dispatch Rush: Inbound orders finalized during the holiday period will be entered into our manufacturing ERP system on a strict first-confirmed, first-produced sequence. Standard inventory dispatch resumes September 28.
Emergency Inquiries & Technical Consultation (24/7 Available)
While our factory floor and physical dispatch centers will pause during the 3-day holiday, our International Sales Engineering Team remains accessible 24/7 to handle urgent furnace breakdown inquiries, RFQ submissions, and shipment status tracking.
If your facility experiences an unexpected lining failure or urgent turnaround requirement:
Official Inquiry Email: inquiry@topower.tech (Monitored continuously with guaranteed response within 4 hours)
Urgent WhatsApp / Phone: +86-19153327338 (Direct duty engineer on call)
Website Live Request: Submit detailed furnace parameters, brick shapes, or blanket square meter requirements via our Request a Quote portal.
Planning Ahead: Golden Week (National Day) Advisory
Please note that the Chinese National Day Golden Week (October 1 – October 7) follows shortly after the Mid-Autumn Festival. Ocean freight container bookings and regional trucking capacity throughout early October face high seasonal demand.
If your facility requires scheduled shipments of ceramic fiber blankets, high alumina refractory bricks, or monolithic castables for October and November installation windows, we strongly advise placing purchase orders or confirming production reservations before September 25 to lock in container space and production slots.
Sincere Holiday Greetings from tprefractory
The Mid-Autumn Festival represents reunion, harmony, and gratitude. The entire management and engineering team at tprefractory extends our heartfelt appreciation to our long-standing industrial partners, steelmakers, furnace builders, and chemical plant operators worldwide for your continued trust and collaboration.
We look forward to supporting your high-temperature operations with steadfast quality and dependable factory-direct refractory supply throughout the remainder of 2026.
Shandong Topower Pte Ltd
Operations & Logistics Department
Date of Notice: September 2026







